We were appointed on a design and build basis to deliver the CAT A+ fit-out of Level 3 at The Met Building, a landmark workspace in the heart of Fitzrovia. Tasked with creating a fully furnished, ready-to-occupy office for Flint Global, the project reflects a seamless integration of design intent and construction delivery - balancing creative ambition with technical precision.

Design & Build Approach

From concept to completion, we led every stage of the process, bringing together interior design, project management, and construction expertise under one coordinated framework. This approach enabled rapid decision-making, design consistency, and cost certainty, ensuring the client’s vision was realised within programme and without compromise.

 Working closely with Lazari Investments, the design language was developed to convey sophistication and subtlety - combining high-end finishes, considered lighting, and smart technology to elevate both aesthetic and function.

Interested in a similar project? Let’s talk

At a glance.

Client: Flint Global

Designer: Signature London

Project time: 12 Weeks

Internal refurbishment, M&E installations, FF&E

Services.

Principal Contractor

Project Management

Specialist Restoration

Bespoke Joinery

Fit-out

M&E

FF&E



Scope of Works:

  • Full design and delivery of 110 ergonomic workstations (including sit/stand options)

  • Seven AV-integrated meeting rooms and ten private phone pods

  • Reception, breakout spaces, and kitchen areas designed for collaboration and comfort

  • Seamless MEP, FF&E, and AV/IT integration to support a connected workplace

  • Premium joinery, bespoke detailing, and tonal finishes throughout

Outcome

The completed project stands as a benchmark for future-focused office environments - where design excellence meets construction precision. The result is a high-performing, beautifully detailed workspace that enhances productivity, flexibility, and brand identity.

Delivered to an exceptional standard and to the client’s complete satisfaction, The Met Building exemplifies Signature London’s capability to design, manage, and construct environments that inspire.

A bit of history

Originally built in 1965 and inspired by New York’s Lever Building, The Met Building has been transformed through a comprehensive redevelopment completed in September 2023.

This refurbishment, undertaken at a Capex cost of £30 million, reimagined the building’s timeless architectural design while integrating modern innovations and sustainability features.